Renexia, Ming Yang, and Kong Join Forces for Safety: Drill at the Taranto Wind Farm Turbine

A Daily Commitment to Safety “Beyond the Standard”
At the Taranto offshore wind farm, safety is a practice built day by day through rigorous procedures, ongoing training, and operational field tests. In this context, Renexia conducted a complex drill to verify and optimize turbine evacuation and rescue procedures. The initiative, which involved the active participation of Renexia’s QAS (Quality, Environment, and Safety) team, is fully aligned with the company’s philosophy of pursuing “safety beyond the standard” by implementing solutions and operational responses that exceed standard regulations. The training represents a pioneering effort in the sector, establishing itself as a model of excellence with very few equals in Europe.
Real-world simulations to improve evacuation procedures
The activity took place over two days and involved QAS Renexia technicians and specialists, Ming Yang technicians, along with trainers from Kong S.p.A., a GWO-certified training company specializing in safe work on wind turbines. The first phase involved a controlled descent from the top of the nacelle using a CRD (Constant Rate Descender) device, an essential procedure for ensuring a safe evacuation in the event of an emergency at height. The second day introduced an additional operational scenario inside the turbine, simulating the rescue of an injured person, placing them on a stretcher, and transferring them to the roof of the nacelle for a controlled descent.
Integrated Expertise for Plant Management
The exercise brought together the expertise of professionals from Kong S.p.A., technicians from Ming Yang and Elettro Wind involved in O&M activities, and the Renexia team responsible for plant management and safety. Kong led the field operations, while Ming Yang, Elettro Wind, and Renexia ensured the turbine’s complete safety and established the operating conditions necessary for conducting the tests.
Toward Ever-Higher Safety Standards
The implementation of evacuation and rescue procedures has confirmed that the prevention and protection measures adopted at the wind farm ensure an effective, structured, and timely response. Cutting-edge training for field personnel, along with the monitoring and analysis of findings, are integral to the process of continuously improving health and safety standards, helping to make the offshore operations of the technicians involved increasingly robust and to strengthen the long-term management of the facility.
Related post
June 29, 2026
Nuclear fusion in Italy: the Renexia–General Fusion agreement
Renexia signs a framework agreement with General Fusion to bring MTF fusion technology to Italy and strengthen the country's energy independence.
April 21, 2026
Renexia Recharge and Atlante boost electric mobility in Central Italy
Renexia Recharge and Atlante are installing new electric vehicle charging stations on the A24 and A25 highways: 20 stations are already operational, with another 8 on the way featuring ultra-fast technology.
February 13, 2026
Renexia’s AXYS FLiDAR for Med Wind: wind and marine weather measurements in the Strait of Sicily
An AXYS FLiDAR WindSentinel has been deployed for a 12-month measurement campaign to support the design of the Med Wind floating offshore wind farm.
November 27, 2025
Med Wind, Along the Routes of Wind and Seabirds
How seabird monitoring works in offshore wind farms: Renexia’s study for Med Wind, between biodiversity and renewable energy.
July 11, 2025
Renexia sails with Goletta Verde: the partnership to give the sea a sustainable future
Also in the summer of 2025 Goletta Verde returns to ply the Italian seas with a special partner: Renexia! We are thrilled to accompany this historic itinerant campaign to raise awareness about safeguarding Italy's waters and coastlines, especially in the Taranto stop on July 11.
April 2, 2025
Med Wind: a new ship customized by Seas Geosciences for geotechnical investigations
With the “BOS Princess” set to set sail in the coming days, the Med Wind project is moving toward a crucial phase that will mark the future of wind energy in the Mediterranean










