GRID PROJECTS

Castelpagano – Morcone

Description: The construction of new wind power plants in the province of Benevento required an upgrade of the national electricity grid operated by Terna. In particular, Renexia, which is involved in the construction of the Circello and Casalduni wind farms, will carry out the high-voltage grid work for Terna, connecting the (existing) Castelpagano substation to the future Morcone substation by means of a 150kV overhead power line, and another single-terminal power line, also 150kV reinforced, to connect the Morcone substation to the future Pontelandolfo hub.

The entire power line measures approximately 23 km including the connection links to the Morcone substation.
The amount of the works is approximately 16M€.