Ponte Albanito

  • Location: Località Ponte Albanito (FG)
  • Total output: 55.800 MWh/year

Description: In October 2012, Renexia S.p.A. obtained the Construction and Operating Authorisation for the construction and operation of the 22.8 MW wind power plant and related connection works to the national electricity grid, to be built in Foggia, in the Ponte Albanito locality.

The plant is able to develop around 55.800 MWh per year, which corresponds to the energy supply for more than 15.000 households each year.

The wind farm went into operation on 29 May 2014 and was sold to CVA – Compagnia Valdostana delle Acque S.p.A. in January 2015.