Beleolico

  • Location: Outer harbour of the Port of Taranto.
  • Total production: 58,200 MWh/year

The Beleolico marine wind farm is the first to be built in the Mediterranean Sea and is located on an area of approximately 131,000 square metres and a 455 square metre maritime area, granted for 30 years by the Taranto Port Authority and handed over to the company in April 2019.

Description: The plant is composed of 10 turbines for a total power of about 30 MW and a consequent estimated production of over 58,000 MWh/year, equal to the energy needs of 18,500 families / 60,000 people.